• English
    • العربية
  • English
  • تسجيل الدخول
  • جامعة قطر
  • مكتبة جامعة قطر
  •  الصفحة الرئيسية
  • الوحدات والمجموعات
عرض التسجيلة 
  •   مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 1: Construction Management and Process
  • عرض التسجيلة
  • مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 1: Construction Management and Process
  • عرض التسجيلة
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Integrating Building Information Management (BIM) in Civil Infrastructure Coordination: Application at LUSAIL Plaza

    Thumbnail
    عرض / فتح
    CIC2020_ Artcile25.pdf (801.2Kb)
    التاريخ
    2020
    المؤلف
    Abotaleb, Mohab Mohamed
    Saab, Elisabeth
    AbdelZaher, Mohamed
    البيانات الوصفية
    عرض كامل للتسجيلة
    الملخص
    The purpose of this case study is to highlight how the BIM modelling can lead to a smooth construction process for MEP (Mechanical, Electrical & Plumbing), Civil, Architectural, and Landscape works, which can aid the engineers in various project phases. An exploratory approach on a complex mega-project case study (El-Sadek & McCabe, 2017), where the project team was coached on exploring the BIM model to identify any clash and discuss with the technical team to come up with adequate solutions, which was done by holding twice a week regular meetings. This paper introduces the issues appeared during the early phases of the design process and continued all the way through the construction phases. While preparing the composite shop drawings, where each discipline/installation will have a clear corridor without interference with other disciplines/installations, and in a manner sufficient to ensure the avoidance of any clash that may arise during construction. However, what happens if the available corridor for all disciplines is very congested and insufficient to enable the designers from accommodating the space needed into coordination process? This case study triggers the need for identifying a new process in integrating BIM models in the coordination challenges through all the phases of mega-projects, as the complexity associated with mega projects appears to increase from one phase to another. From the lesson learned in this case study readers will know how integrating BIM in the coordination process in complex scale projects can decrease the clashes and improve progress of work during construction phase.
    معرّف المصادر الموحد
    http://www.cic.qa
    DOI/handle
    http://dx.doi.org/10.29117/cic.2020.0032
    http://hdl.handle.net/10576/14682
    المجموعات
    • Theme 1: Construction Management and Process [‎27‎ items ]

    entitlement


    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    الصفحة الرئيسية

    أرسل عملك التابع لجامعة قطر

    تصفح

    محتويات مركز المجموعات الرقمية
      الوحدات والمجموعات تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر
    هذه المجموعة
      تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر

    حسابي

    تسجيل الدخول

    إحصائيات

    عرض إحصائيات الاستخدام

    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    Video