  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 1: Construction Management and Process
  • عرض التسجيلة
  • مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2020)
  • Theme 1: Construction Management and Process
  • عرض التسجيلة
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Risk Management for Qatar Expressway Program

    Thumbnail
    عرض / فتح
    CIC2020_ Artcile26.pdf (1.680Mb)
    التاريخ
    2020
    المؤلف
    Abd Rahman, Nor Rozaini
    البيانات الوصفية
    عرض كامل للتسجيلة
    الملخص
    The construction of expressway projects associated with the various main risks such as political risks, legal risks, economic risks, cultural risks, and construction risks are considered critical and essential to be identified and mitigated in early stage for every minor or major projects. According to Dziadosz and Rejment (2015), the risk is a measurable part of uncertainty, for which we are able to estimate the occurrence probability and the size of damage. The risk is assumed as a deviation from the desired level. It can be positive or, which most often happens, it can be negative. Therefore, the risks analysis is so important for project selection and coordination of construction work. This paper identifies the level of severity of construction risks which had affected the implementation of the expressway/highway projects in Qatar. This research is also focused on the importance in practising the formality of risk management process by identifying the problems and difficulties associated with the projects risks, which includes obtaining the important information and suggestion the risk response in order to be used on future projects in the particular and focusing the risk mitigation in the early stage is necessary. There could be a possibility that the identified projects were not fully assessing the significant risk factors during feasibility studies, design stage, tender stage and construction stage. Based on a literature review, structured interviews with experts, unstructured interviews and detailed case studies, it was found that major participants agreed that the risk management process was satisfactorily adopted for ongoing and previous infrastructure projects in Qatar. The critical construction risk was design changes, new requirements, land acquisition, interfacing works and additional works which had caused the cost overrun and delay the completion works.
    معرّف المصادر الموحد
    http://www.cic.qa
    DOI/handle
    http://dx.doi.org/10.29117/cic.2020.0033
    http://hdl.handle.net/10576/14683
    المجموعات
    • Theme 1: Construction Management and Process [‎27‎ items ]

    entitlement


    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا
    اتصل بنا | جامعة قطر

     

     

    الصفحة الرئيسية

    أرسل عملك التابع لجامعة قطر

    تصفح

    محتويات مركز المجموعات الرقمية
      الوحدات والمجموعات تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر
    هذه المجموعة
      تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر

    حسابي

    تسجيل الدخول

    إحصائيات

    عرض إحصائيات الاستخدام

    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا
    اتصل بنا | جامعة قطر

     

     

    Video