• English
    • العربية
  • English
  • تسجيل الدخول
  • جامعة قطر
  • مكتبة جامعة قطر
  •  الصفحة الرئيسية
  • الوحدات والمجموعات
عرض التسجيلة 
  •   مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 2: Advances in Infrastructure Sustainability, Renovation, and Monitoring
  • عرض التسجيلة
  • مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 2: Advances in Infrastructure Sustainability, Renovation, and Monitoring
  • عرض التسجيلة
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Tunnel Surveying Works: A Technical Challenge of 10 km-long tunnel under the Arabian Gulf-Qatar

    Thumbnail
    عرض / فتح
    070.pdf (704.5Kb)
    التاريخ
    2023
    المؤلف
    Peach, Gary
    Al-Marri, Saad Zayed
    Fernandez, Hernan Vigil
    Kazingizi, Simbarashe
    Chumakou, Pavel
    البيانات الوصفية
    عرض كامل للتسجيلة
    الملخص
    The Musaimeer Pump Station & Outfall Tunnel project (MPSO) was constructed as one of the longest Outfall tunnels in the World with a total length of 10.189m and at the same time being the longest undersea tunnel in the Middle East. MPSO will manage ground- and storm-water from the Southern Doha District and dispose of this water via a diffuser bed connected to the outfall tunnel. Difficulties faced during the project execution were firstly, the tunnel network itself. It was necessary to maintain precision and reliability of the 10km network, in a tunnel of smaller than 5m in diameter, starting from a 26m diameter drop shaft. Secondly, the breakthrough was into a 3m diameter vertically positioned riser shaft encased in a 5m x 5m concrete block which was positioned and constructed offshore by utilizing different network of 10km Global Positioning System Real-Time Kinematic (GPS RTK) readings. The key problem was confirming that both survey networks used were homogenous as the marine tolerances in comparison to the tunnel tolerances were very different. Thirdly, the actual Tunnel Boring Machine (TBM) connection was under the sea. The TBM excavated through a concrete filled shaft 0.6m beneath the riser shaft invert, then excavated 35m to create working space for civil works. The tunnel's crown was then cut using a 3m diameter opening to connect into the bottom of the riser shaft. This study serves to describe the Survey technical issues faced in the construction and coordination of underground tunneling and interfacing with offshore works.
    معرّف المصادر الموحد
    https://doi.org/10.29117/cic.2023.0070
    DOI/handle
    http://hdl.handle.net/10576/46773
    المجموعات
    • Theme 2: Advances in Infrastructure Sustainability, Renovation, and Monitoring [‎68‎ items ]

    entitlement


    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    الصفحة الرئيسية

    أرسل عملك التابع لجامعة قطر

    تصفح

    محتويات مركز المجموعات الرقمية
      الوحدات والمجموعات تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر
    هذه المجموعة
      تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر

    حسابي

    تسجيل الدخول

    إحصائيات

    عرض إحصائيات الاستخدام

    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا | ارسل ملاحظاتك
    اتصل بنا | ارسل ملاحظاتك | جامعة قطر

     

     

    Video