• English
    • العربية
  • English
  • تسجيل الدخول
  • جامعة قطر
  • مكتبة جامعة قطر
  •  الصفحة الرئيسية
  • الوحدات والمجموعات
  • حقوق النشر
عرض التسجيلة 
  •   مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 1: Contemporary issues in Construction Engineering and Management
  • عرض التسجيلة
  • مركز المجموعات الرقمية لجامعة قطر
  • المستودع الرقمي لجامعة قطر
  • أكاديمية
  • إصدارات جامعة قطر
  • وقائع مؤتمرات
  • International Conference on Civil Infrastructure and Construction (CIC 2023)
  • Theme 1: Contemporary issues in Construction Engineering and Management
  • عرض التسجيلة
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Focus on Lean Construction at Umm Lekhba (Landmark) Interchange

    Thumbnail
    عرض / فتح
    012.pdf (1.133Mb)
    التاريخ
    2023
    المؤلف
    Halimeh, Nader
    البيانات الوصفية
    عرض كامل للتسجيلة
    الملخص
    Umm Lekhba (Landmark) Interchange is the largest four level Interchange built in Doha-Qatar, which has 9 flyover bridges with 11 km in total length, constructed partly using 735 heavy precast concrete segments fabricated off-site, transported, and installed using heavy cranes and launching trusses with a minimum impact on the public traffic flow and on the shopping activities at the busiest interchange in Doha. The Lean Construction Institution-Qatar (LCI-Q) was established in October 2019, and the Lean Construction implementation became mandatory for all new projects of Ashghal in Qatar as of 2022, however the construction of Landmark Interchange was started in May 2017, and two of its flyover bridges were opened to traffic at the end of 2019. The contract of the Landmark project did not mandate implementation of Lean Construction but the contractor had implemented part of Lean Construction and BIM techniques at his own cost to overcome the challenges faced in the design and construction of the project, including consideration of using the Last Planner System, Organization/Standardization of the workplace, implementation of Just in Time concept, using a systematic procurement approach, utilization of Multi-layer subcontractors and consultants, etc. This paper will present briefly the construction of Landmark Bridges and discuss Lean implementation during the construction.
    معرّف المصادر الموحد
    https://doi.org/10.29117/cic.2023.0012
    DOI/handle
    http://hdl.handle.net/10576/47046
    المجموعات
    • Theme 1: Contemporary issues in Construction Engineering and Management [‎39‎ items ]

    entitlement


    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا
    اتصل بنا | جامعة قطر

     

     

    الصفحة الرئيسية

    أرسل عملك التابع لجامعة قطر

    تصفح

    محتويات مركز المجموعات الرقمية
      الوحدات والمجموعات تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر
    هذه المجموعة
      تاريخ النشر المؤلف العناوين الموضوع النوع اللغة الناشر

    حسابي

    تسجيل الدخول

    إحصائيات

    عرض إحصائيات الاستخدام

    مركز المجموعات الرقمية لجامعة قطر هو مكتبة رقمية تديرها مكتبة جامعة قطر بدعم من إدارة تقنية المعلومات

    اتصل بنا
    اتصل بنا | جامعة قطر

     

     

    Video