• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Chemical Engineering
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Chemical Engineering
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Managing Jetty Boil-Off Gas for More Sustainable LNG Export Terminals

    View/Open
    bouabidi-et-al-2024-managing-jetty-boil-off-gas-for-more-sustainable-lng-export-terminals.pdf (2.695Mb)
    Date
    2024
    Author
    Bouabidi, Zineb
    Al-Musleh, Easa I.
    Al Momani, Fares
    Al-Sobhi, Saad
    Karimi, Iftekhar A
    Metadata
    Show full item record
    Abstract
    Liquefied natural gas (LNG) is a key component in the global energy mix, offering a cleaner alternative to traditional fossil fuels. Managing boil-off gas (BOG) at export terminals, however, presents significant challenges. If not properly managed, BOG can compromise safety, waste resources, and pollute the environment. This study evaluates strategies for BOG management, including integrating jetty BOG into the fuel system, minimizing BOG generation through LNG subcooling, and BOG liquefaction. Detailed simulations and economic evaluations confirmed that all strategies are profitable. Liquefaction using recirculating LNG is the most effective, increasing LNG output by 1.62% and yielding an annual profit of $28.50 million. Other successful strategies include liquefaction in separate and existing cycles, which increase LNG by 1.38% and 1.36%, resulting in annual profits of $23.50 million and $23.84 million, respectively. Integrating the jetty BOG into the fuel system also results in a 0.63% increase in LNG, generating $11.01 million annually. Subcooling using a main cryogenic heat exchanger and nitrogen prestorage boosts LNG production by 0.53% and 0.45%, with profits of $9.25 million and $5.93 million, respectively. These strategies not only enhance LNG production and profitability but also optimize resource use and reduce environmental impacts, thus supporting broader sustainability goals.
    DOI/handle
    http://dx.doi.org/10.1021/acssuschemeng.4c03307
    http://hdl.handle.net/10576/65730
    Collections
    • Chemical Engineering [‎1247‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video