• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Civil and Environmental Engineering
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Civil and Environmental Engineering
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Dilution of seawater using dewatered construction water in a hybrid forward osmosis system

    Thumbnail
    View/Open
    Publisher version (You have accessOpen AccessIcon)
    Publisher version (Check access options)
    Check access options
    Date
    2018
    Author
    Hawari A.H.
    Al-Qahoumi A.
    Ltaief A.
    Zaidi S.
    Altaee A.
    Metadata
    Show full item record
    Abstract
    In this study, dewatered construction water was used for the first time as the feed solution in a combined pretreatment-forward osmosis process to dilute seawater (i.e. draw solution) for further desalination. It was found that at a feed solution and a draw solution flow rate of 2.2 L min−1 gave the optimum membrane flux with minimal fouling effects. The addition of a spacer in the membrane feed side was effective at low flow rates (0.8 and 1.5 L min−1). The feed solution was then pretreated using two methods: settling and multimedia filtration and used in the forward osmosis unit at a low flow rate of 0.8 L min−1 using a spacer at the feed side. Results revealed a significant increase in the forward osmosis membrane flux by 64.3% when multimedia filtration was carried out with a flux reduction of 7.7%. While the settling method achieved only 13.5% increase in the permeate flux and 12.5% flux reduction. The multimedia filtration process removed most of the particles that would cause fouling which resulted in an elevated and more consistent membrane flux. Results also showed that the water flux was 1.3 times higher when the membrane's active layer was facing the draw solution than when it was facing the feed solution. Cost analysis showed that forward osmosis treatment of dewatered construction water was 7.88 $.day−1 and it was slightly cheaper when the forward osmosis operates in the pressure retarded osmosis mode.
    DOI/handle
    http://dx.doi.org/10.1016/j.jclepro.2018.05.211
    http://hdl.handle.net/10576/13162
    Collections
    • Center for Advanced Materials Research [‎1570‎ items ]
    • Civil and Environmental Engineering [‎869‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video