• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • About QSpace
    • Vision & Mission
  • Help
    • Item Submission
    • Publisher policies
    • User guides
      • QSpace Browsing
      • QSpace Searching (Simple & Advanced Search)
      • QSpace Item Submission
      • QSpace Glossary
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Electrical Engineering
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Electrical Engineering
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Stochastic linear programming for optimal planning of battery storage systems under unbalanced-uncertain conditions

    Thumbnail
    View/Open
    Stochastic_Linear_Programming_for_Optimal_Planning_of_Battery_Storage_Systems_Under_Unbalanced-uncertain_Conditions.pdf (544.7Kb)
    Date
    2020
    Author
    Hemmati, Reza
    Mehrjerdi, Hasan
    Metadata
    Show full item record
    Abstract
    Battery energy storage system (BESS) has already been studied to deal with uncertain parameters of the electrical systems such as loads and renewable energies. However, the BESS have not been properly studied under unbalanced operation of power grids. This paper aims to study the modelling and operation of BESS under unbalanced-uncertain conditions in the power grids. The proposed model manages the BESS to optimize energy cost, deal with load uncertainties, and settle the unbalanced loading at the same time. The three-phase unbalanced-uncertain loads are modelled and the BESSs are utilized to produce separate charging/discharging pattern on each phase to remove the unbalanced condition. The IEEE 69-bus grid is considered as case study. The load uncertainty is developed by Gaussian probability function and the stochastic programming is adopted to tackle the uncertainties. The model is formulated as mixed-integer linear programming and solved by GAMS/ CPLEX. The results demonstrate that the model is able to deal with the unbalanced-uncertain conditions at the same time. The model also minimizes the operation cost and satisfies all security constraints of power grid. 2020, Springer. All rights reserved.
    DOI/handle
    http://dx.doi.org/10.35833/MPCE.2019.000324
    http://hdl.handle.net/10576/36368
    Collections
    • Electrical Engineering [‎2850‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us
    Contact Us | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policies

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us
    Contact Us | QU

     

     

    Video