| dc.contributor.author |
Saad, Omar M. [عمر محمد سعد] |
en_US |
| dc.date.accessioned |
2009-11-25T13:05:33Z |
|
| dc.date.available |
2009-11-25T13:05:33Z |
|
| dc.date.issued |
2002 |
en_US |
| dc.identifier.citation |
Engineering Journal of Qatar University, 2002, Vol. 15, Pages 211-222. |
en_US |
| dc.identifier.uri |
http://hdl.handle.net/10576/7935 |
|
| dc.description.abstract |
This paper presents a solution algorithm for solving the job-shop scheduling problem involving fu/zy parameters in the constraints. It is considered that the processing times are those tuz/y parameters and the maximum completion time is required to be ininimi/ed. The concept of OC - level set together with the definition of the hi/./y number and Its membership function are introduced. An illustrative numerical example is given to claruv the theory and the solution algorithm |
en_US |
| dc.language.iso |
en |
en_US |
| dc.publisher |
Qatar University |
en_US |
| dc.subject |
Engineering: Mechanical Engineering |
en_US |
| dc.title |
On The Solution Of The Job-Shop Scheduling Problem Under Fl Zzv Environment |
en_US |
| dc.type |
Article |
en_US |
| dc.identifier.pagination |
211-222 |
en_US |
| dc.identifier.volume |
15 |
en_US |