• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Student Thesis & Dissertations
  • College of Engineering
  • Engineering Management
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Student Thesis & Dissertations
  • College of Engineering
  • Engineering Management
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Cost Based of Value Stream Mapping as a Lean Construction Tool for Underground Pipeline Construction Projects

    Thumbnail
    View/Open
    Master Thesis-Master of Science.pdf (3.753Mb)
    Date
    2018-01
    Author
    Naser, Ayman Fahmi
    Metadata
    Show full item record
    Abstract
    Contractors want to improve the construction productivity and utilize an efficient, cost calculation which assists the company to get accurate cost that can be presented during next estimation for similar construction projects. This study deals with the application of Value Stream Mapping (VSM) as a lean construction tool on a real construction for installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value added activities and time wastes during each construction stage, and the study searched for an efficient, way to consider the cost of e the studied underground pipeline. This review is unique in its approach that it adopts cost implementation of VSM to improve the productivity of underground pipeline projects. A real construction project was observed and relevant data were collected from the site during construction, indicating the value added, non-value added and process time for each construction stage. The current state was built based on these details. This is a process management tool and exercise to keep opening eyes as a trigger for improvement. After a current state assessment, a future state is attempted by value stream mapping tool balancing the resources using a line of balance (LOB) technique. This study is unique in its way that it adopts cost and LOB implementation of VSM to improve the productivity of underground pipeline projects. Moreover, a cost estimation model was developed during current state and future state to calculate the cost of constructing the underground pipeline. The results show a cost reduction of 20.8 % between current and future states. This reflects the importance of the cost based value stream mapping in construction as a useful tool. This new tool could be utilized in the construction industry to improve the efficiency and cost management.
    DOI/handle
    http://hdl.handle.net/10576/11220
    Collections
    • Engineering Management [‎140‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video