• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Electrical Engineering
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Electrical Engineering
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Simultaneous load leveling and voltage profile improvement in distribution networks by optimal battery storage planning

    Thumbnail
    View/Open
    Publisher version (You have accessOpen AccessIcon)
    Publisher version (Check access options)
    Check access options
    Date
    2019
    Author
    Mehrjerdi H.
    Metadata
    Show full item record
    Abstract
    Battery Energy Storage Systems can provide various applications in the distribution networks including load leveling, expansion deferral, voltage profile improvement, frequency regulation, fast reserve, and renewable energy time shift. Despite offering various applications, the BESSs are characterized with high investment costs. An optimal investment plan can justify the cots by exploiting multiple simultaneous applications. To this end, this paper proposes a novel planning model for the BESSs in distribution network wherein both load leveling and voltage profile improvement applications are extracted. The load leveling application refers to storing cheap energy at off-peak periods to deliver at peak period with high energy costs. In this way, the load profile tends to be flat and resulting lower energy cost. The voltage profile improvement is achieved by the optimal reactive power control of the inverter located between the BESS and the grid. The idea is that the inverter can allocate rated power capacity to the reactive power exchange at periods with negligible or zero active power conversion. Simulation results demonstrate that the voltage profile can improve in some degrees without increasing planning and/or operation costs. Higher degrees of improvement can be achieved at the expanse of cost increase. Also, the simulations show that the conducted load leveling results to loss reduction, peak shaving, and network expansion deferral subsequently. - 2019 Elsevier Ltd
    DOI/handle
    http://dx.doi.org/10.1016/j.energy.2019.06.021
    http://hdl.handle.net/10576/14505
    Collections
    • Electrical Engineering [‎2821‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video