• English
    • العربية
  • العربية
  • Login
  • QU
  • QU Library
  •  Home
  • Communities & Collections
  • Help
    • Item Submission
    • Publisher policies
    • User guides
    • FAQs
  • About QSpace
    • Vision & Mission
View Item 
  •   Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Electrical Engineering
  • View Item
  • Qatar University Digital Hub
  • Qatar University Institutional Repository
  • Academic
  • Faculty Contributions
  • College of Engineering
  • Electrical Engineering
  • View Item
  •      
  •  
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Stochastic model for electric vehicle charging station integrated with wind energy

    Thumbnail
    View/Open
    Publisher version (You have accessOpen AccessIcon)
    Publisher version (Check access options)
    Check access options
    Date
    2020
    Author
    Mehrjerdi, Hasan
    Hemmati, Reza
    Metadata
    Show full item record
    Abstract
    This paper designs optimal charging facility and capacity for electric vehicle charging station. The charging facility is modeled containing fast, intermediate, and slow speed chargers. The nominal powers of these chargers are determined. The charging station is linked to the utility grid and it is supplied by wind energy and the energy storage devices. The optimal sizing and operation of storage system are optimized. The electrical grid is strengthened by line reinforcement. The uncertainty of wind power is included and dealt by stochastic programming. The model is expressed as stochastic mixed integer linear programming and solved by GAMS toolbox. The results demonstrate that the rated powers of quick, intermediate, and slow speed chargers are optimized on 116, 84, and 52 kW, respectively. The power of quick charger is 27% more than the intermediate one and the intermediate charger needs about 38% larger power facility compared to the slow speed system. The storage system is designed with rated power equal to 133 kW and it can discharge 85% of its energy during one hour. The lines are reinforced by 183% to supply the energy demand of the charging station. The energy, network reinforcement, and charging facility cover about 70%, 15%, and 12% of total cost. The network without storage system needs about 2% more reinforcement. Reduction of line reinforcement by 30% increases the battery power about 4 times. 2019 Elsevier Ltd
    DOI/handle
    http://dx.doi.org/10.1016/j.seta.2019.100577
    http://hdl.handle.net/10576/36369
    Collections
    • Electrical Engineering [‎2823‎ items ]

    entitlement


    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Home

    Submit your QU affiliated work

    Browse

    All of Digital Hub
      Communities & Collections Publication Date Author Title Subject Type Language Publisher
    This Collection
      Publication Date Author Title Subject Type Language Publisher

    My Account

    Login

    Statistics

    View Usage Statistics

    About QSpace

    Vision & Mission

    Help

    Item Submission Publisher policiesUser guides FAQs

    Qatar University Digital Hub is a digital collection operated and maintained by the Qatar University Library and supported by the ITS department

    Contact Us | Send Feedback
    Contact Us | Send Feedback | QU

     

     

    Video