عرض بسيط للتسجيلة

المؤلفGunduz, Murat
المؤلفElsherbeny, Hesham Ahmed
تاريخ الإتاحة2024-10-01T10:40:25Z
تاريخ النشر2020-04-27
اسم المنشورEngineering, Construction and Architectural Management
المعرّفhttp://dx.doi.org/10.1108/ECAM-05-2019-0246
الاقتباسGunduz, M., & Elsherbeny, H. A. (2020). Critical assessment of construction contract administration using fuzzy structural equation modeling. Engineering, Construction and Architectural Management, 27(6), 1233-1255.
الرقم المعياري الدولي للكتاب0969-9988
معرّف المصادر الموحدhttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85084238895&origin=inward
معرّف المصادر الموحدhttp://hdl.handle.net/10576/59634
الملخصPurpose: This paper covers the development of a multidimensional contract administration performance model (CAPM) for construction projects. The proposed CAPM is intended to be used by the industry stakeholders to measure the construction contract administration (CCA) performance and identify the strengths and weaknesses of the CCA system for running or completed projects. Design/methodology/approach: The research design follows a sequential mixed methodology of qualitative and quantitative data collection and analysis. In the first phase, contract administration indicators were collected from relevant literature. In the second phase, an online questionnaire was prepared, and data were collected and analyzed using the crisp value of fuzzy membership function, and structural equation modeling (SEM). The fuzzy set was chosen for this study due to the presence of uncertainty and fuzziness associated with the importance of several key indicators affecting the CCA performance. Finally, SEM was used to test and analyze interrelationships among constructs of CCA performance. Findings: The data collected from 336 construction professionals worldwide through an online survey was utilized to develop the fuzzy structural equation model. The goodness-of-fit and reliability tests validated the model. The study concluded a significant correlation between CCA performance, CCA operational indicators, and the process groups. Originality/value: The contribution of this paper to the existing knowledge is the development of a fuzzy structural equation model that serves as a measurement tool for the contract administration performance. This is the first quantitative structural equation model to capture contract administration performance. The model consists of 93 Construction Contract Administration(CCA) performance indicators categorized into 11 project management process groups namely: project governance and start-up; team management; communication and relationship management; quality and acceptance management; performance monitoring and reporting management; document and record management; financial management; changes and control management; claims and dispute resolution management; contract risk management and contract closeout management.
راعي المشروعThe publication of this article was funded by the Qatar National Library.
اللغةen
الناشرEmerald Publishing
الموضوعContract administration
Contract project management
Contract project success factor
Contract risk assessment
Fuzzy set
Structural equation model
العنوانCritical assessment of construction contract administration using fuzzy structural equation modeling
النوعArticle
الصفحات1233-1255
رقم العدد6
رقم المجلد27
ESSN1365-232X
dc.accessType Open Access


الملفات في هذه التسجيلة

Thumbnail

هذه التسجيلة تظهر في المجموعات التالية

عرض بسيط للتسجيلة