عرض بسيط للتسجيلة

المؤلفGunduz, Murat
المؤلفSahin, Haci Bayram
تاريخ الإتاحة2024-10-03T10:00:55Z
تاريخ النشر2015-07-04
اسم المنشورJournal of Civil Engineering and Management
المعرّفhttp://dx.doi.org/10.3846/13923730.2015.1041768
الاقتباسGunduz, M., & Sahin, H. B. (2015). An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis (vol 21, pg 470, 2015). JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 21(5), 678-678.
الرقم المعياري الدولي للكتاب1392-3730
معرّف المصادر الموحدhttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84929152939&origin=inward
معرّف المصادر الموحدhttp://hdl.handle.net/10576/59746
الملخصThe printed version of the article “An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis” by Murat Gunduz and Haci Bayram Sahin published in the Journal of Civil Engineering and Management 21(4): 470–477, doi:10.3846/13923730.2014.890657, contained the following error:• On page 477 the author’s biography should read:
اللغةen
الناشرVilnius Gediminas Technical University
الموضوعCivil Engineering
hydroelectric
العنوانErratum: An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis (Journal of Civil Engineering and Management 21:4 (470-477) DOI: 10.3846/13923730.2014.890657)
النوعArticle
الصفحات678-678
رقم العدد5
رقم المجلد21
ESSN1822-3605
dc.accessType Open Access


الملفات في هذه التسجيلة

Thumbnail

هذه التسجيلة تظهر في المجموعات التالية

عرض بسيط للتسجيلة