Erratum: An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis (Journal of Civil Engineering and Management 21:4 (470-477) DOI: 10.3846/13923730.2014.890657)
المؤلف | Gunduz, Murat |
المؤلف | Sahin, Haci Bayram |
تاريخ الإتاحة | 2024-10-03T10:00:55Z |
تاريخ النشر | 2015-07-04 |
اسم المنشور | Journal of Civil Engineering and Management |
المعرّف | http://dx.doi.org/10.3846/13923730.2015.1041768 |
الاقتباس | Gunduz, M., & Sahin, H. B. (2015). An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis (vol 21, pg 470, 2015). JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 21(5), 678-678. |
الرقم المعياري الدولي للكتاب | 1392-3730 |
الملخص | The printed version of the article “An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis” by Murat Gunduz and Haci Bayram Sahin published in the Journal of Civil Engineering and Management 21(4): 470–477, doi:10.3846/13923730.2014.890657, contained the following error:• On page 477 the author’s biography should read: |
اللغة | en |
الناشر | Vilnius Gediminas Technical University |
الموضوع | Civil Engineering hydroelectric |
النوع | Article |
الصفحات | 678-678 |
رقم العدد | 5 |
رقم المجلد | 21 |
ESSN | 1822-3605 |
الملفات في هذه التسجيلة
هذه التسجيلة تظهر في المجموعات التالية
-
الهندسة المدنية [851 items ]