Erratum: An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis (Journal of Civil Engineering and Management 21:4 (470-477) DOI: 10.3846/13923730.2014.890657)
Date
2015-07-04Metadata
Show full item recordAbstract
The printed version of the article “An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis” by Murat Gunduz and Haci Bayram Sahin published in the Journal of Civil Engineering and Management 21(4): 470–477, doi:10.3846/13923730.2014.890657, contained the following error:• On page 477 the author’s biography should read:
Collections
- Civil and Environmental Engineering [851 items ]