Erratum: An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis (Journal of Civil Engineering and Management 21:4 (470-477) DOI: 10.3846/13923730.2014.890657)
التاريخ
2015-07-04البيانات الوصفية
عرض كامل للتسجيلةالملخص
The printed version of the article “An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis” by Murat Gunduz and Haci Bayram Sahin published in the Journal of Civil Engineering and Management 21(4): 470–477, doi:10.3846/13923730.2014.890657, contained the following error:• On page 477 the author’s biography should read:
معرّف المصادر الموحد
https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84929152939&origin=inwardالمجموعات
- الهندسة المدنية [851 items ]